# Projects overview

Everything you deploy on Vercel lives in a project: a frontend, backend APIs, background workloads, containers, or multiple services. You or your agent can deploy a project from Git, [Vercel CLI](/docs/cli), the [Vercel REST API](/docs/rest-api), or [Vercel Drop](/docs/drop).


<!-- docsgraph:related -->
## Related pages

> **For AI agents:** Follow these links to understand how this page connects to the rest of the Vercel ecosystem. For the full cross-link map (inbound, outbound, prerequisites, and semantic neighbors), see the .graph.md link below.

- [Tag-based cache invalidation now available for all responses](https://vercel.com/changelog/tag-based-cache-invalidation-now-available-for-all-responses)
- [How to execute AI-generated code safely with Vercel Sandbox](https://vercel.com/kb/guide/how-to-execute-ai-generated-code-safely) — Learn how to run code generated by AI models in an isolated sandbox environment.
- [How to reconnect to a running Sandbox](https://vercel.com/kb/guide/how-to-reconnect-to-a-running-sandbox) — Learn how to use \\`Sandbox.get\\(\\)\\` to reconnect to an existing sandbox from a different process or after a script rest
- [How to use snapshots for faster sandbox startup](https://vercel.com/kb/guide/how-to-use-snapshots-for-faster-sandbox-startup) — Learn how to save sandbox state with snapshots and skip installation on future runs.
- [Running OpenCode securely with the Vercel Sandbox](https://vercel.com/kb/guide/running-opencode-securely-with-the-vercel-sandbox) — Run OpenCode in an isolated Vercel Sandbox MicroVM with controlled egress, using the SDK to restrict network access so t
- [How to fix “unable to find your GitHub repository” on Vercel](https://vercel.com/kb/guide/unable-to-find-github-repository) — Learn how to check GitHub permissions to ensure your Vercel account has sufficient access to import your repository.
- [Multi-Project Platforms Reference](https://vercel.com/docs/platforms/multi-project-platforms/reference) — API reference, error codes, troubleshooting, and FAQ for multi-project platforms on Vercel.
- [Multi-Project Platforms Concepts](https://vercel.com/docs/platforms/multi-project-platforms/concepts) — Understand projects, deployments, domains, and architecture for multi-project platforms on Vercel.
- [Getting started with Vercel](https://vercel.com/docs/getting-started-with-vercel) — Install the Vercel CLI, add the Vercel Plugin or agent skills, connect Vercel MCP, and deploy your first project.
- [Builds](https://vercel.com/docs/builds) — Understand how the build step works when creating a Vercel Deployment.
- [Managing Deployments](https://vercel.com/docs/deployments/managing-deployments) — Learn how to manage your current and previously deployed projects to Vercel through the dashboard. You can redeploy at a

Full cross-link map for this page: [/docs/projects.graph.md](/docs/projects.graph.md)
<!-- /docsgraph:related -->

A project groups [deployments](/docs/deployments), domains, environment variables, build and runtime settings, integrations, security controls, and observability. Each project belongs to a team and can have one production deployment alongside many pre-production or preview deployments.

## What can you deploy

### Frontend and full-stack applications

Deploy static sites, server-rendered applications, and full-stack applications built with [Next.js](/docs/frameworks/full-stack/nextjs), React, Vue, Svelte, Nuxt, Astro, and other supported [frameworks](/docs/frameworks). Vercel detects the framework and configures the build output, routing, caching, and runtime for the project.

Use [Incremental Static Regeneration](/docs/incremental-static-regeneration), streaming, [Partial Prerendering](/docs/partial-prerendering), [Image Optimization](/docs/image-optimization), and the [CDN](/docs/cdn) to serve content globally.

### Backend APIs and services

Use [Vercel Functions](/docs/functions) to deploy API routes, webhooks, streamed responses, and request handlers. Vercel Functions support multiple runtimes, including Node.js, [Python](/docs/functions/runtimes/python), [Go](/docs/functions/runtimes/go), Bun, Rust, Ruby, WebAssembly, and the Edge Runtime. You can also deploy backend frameworks such as [FastAPI](/docs/frameworks/backend/fastapi), Flask, Django, Express, Fastify, Hono, NestJS, and Koa.

[Fluid Compute](/docs/fluid-compute) adds optimized concurrency, dynamic scaling, background processing, and failover to supported runtimes. Use it for workloads that spend time waiting on database queries, API calls, and AI requests.

Vercel Functions can serve [WebSocket connections](/docs/functions/websockets) for realtime applications, chat, collaboration, and AI streaming. Connections remain on the function instance that accepted them, so applications should handle reconnects and store shared state in a durable data store.

### Containerized applications and multi-service projects

Use [Container Images](/docs/functions/container-images) (currently in [Beta](/docs/release-phases#beta)) to run Open Container Initiative (OCI)-compatible images built from a `Dockerfile` or `Containerfile`. [Vercel Container Registry](/docs/container-registry) stores images that you can run with Vercel Functions or use as custom [Sandbox](/docs/sandbox) images.

With [Vercel Services](/docs/services), your project can contain multiple frontends and backends. Route public traffic to each service and use service bindings for private service-to-service communication. This lets a project represent a larger application without combining every component into one build.

### Scheduled, queued, and durable workloads

In a project, you can run work outside a user request with:

- [Cron Jobs](/docs/cron-jobs) for scheduled function invocations.
- [Vercel Queues](/docs/queues) for durable messages, delayed delivery, retries, and push or poll consumers.
- [Vercel Workflows](/docs/workflows) for multi-step code that can retry steps, sleep, wait for external events, and resume across crashes and deployments.
- [Daemons](/docs/daemons) for long-running background workers, such as queue consumers, that run a fixed number of container instances.

Workflows support JavaScript, TypeScript, and Python through the [Workflow SDK](https://workflow-sdk.dev/), and provide managed persistence and dashboard observability.

### AI applications and agent workloads

Combine a project with the [AI SDK](/docs/ai-sdk), [AI Gateway](/docs/ai-gateway), and [Chat SDK](/docs/chat-sdk) to build AI applications, chat experiences, and model-powered APIs. AI Gateway provides a unified API for model providers, routing, fallbacks, usage tracking, and spend controls.

Use [Vercel Sandbox](/docs/sandbox) to run untrusted or agent-generated code in isolated Linux microVMs. Sandboxes support command execution, files, processes, exposed ports, snapshots, persistent environments, remote storage, and custom OCI images through the Vercel Container Registry.

[Vercel Agent](/docs/agent), [eve](/docs/eve), [Vercel MCP](/docs/mcp), and [Vercel Connect](/docs/connect) provide additional building blocks for agents that investigate applications, call tools, access external services, and preserve progress across long-running tasks.

### Platforms and independently deployed applications

With [Vercel for Platforms](/docs/platforms), you can serve many tenants from one project, or give each tenant or generated application an isolated project and deployment. You can create projects programmatically and manage custom domains, subdomains and preview URLs.

[Microfrontends](/docs/microfrontends) lets you split a large application into projects that deploy independently but render as one application. You can keep them in a monorepo or in separate repositories. Vercel routes requests between them.

## From project to deployment

When you connect a project to Git, pushes and pull requests can create deployments automatically. A project can also be deployed without a Git connection using [Vercel CLI](/docs/cli), [Vercel Drop](/docs/drop), the [Vercel REST API](/docs/rest-api), or [Deploy Hooks](/docs/deploy-hooks).

Each deployment receives a URL and belongs to an [environment](/docs/deployments/environments), such as production, preview, or a custom environment. You can inspect deployments, share previews, promote a deployment to production, use [Rolling Releases](/docs/rolling-releases), or restore a previous version with [Instant Rollback](/docs/instant-rollback).

When using a monorepo, you can connect multiple projects to one repository and assign each project its own root directory and build settings. Use [Turborepo](/docs/monorepos/turborepo) and [Remote Caching](/docs/monorepos/remote-caching) to coordinate builds across the repository.

## What a project contains

### Build and runtime configuration

Project settings control the framework, root directory, install command, build command, output directory, Node.js version, [function runtime and region](/docs/functions/configuring-functions/region), and deployment behavior. You can manage these settings in the dashboard or define them in [`vercel.json`](/docs/project-configuration/vercel-json), [`vercel.ts`](/docs/project-configuration/vercel-ts), or [`vercel.toml`](/docs/project-configuration/vercel-toml).

### Environment variables, data, and integrations

Use [Environment Variables](/docs/environment-variables) for configuration and secrets across development, preview, production, and custom environments. Connect a project to [Vercel Blob](/docs/vercel-blob), [Global Config](/docs/global-config), or databases and other services through the [Vercel Marketplace](/docs/marketplace-storage). Marketplace resources can provide connection details to the project as environment variables.

### Domains, delivery, and security

Assign [custom domains](/docs/domains) and configure DNS, SSL, redirects, rewrites, headers, and caching for a project. Protect deployments with [Deployment Protection](/docs/deployment-protection), and protect application traffic with the [Vercel Firewall](/docs/vercel-firewall), Web Application Firewall (WAF) rules, rate limiting, bot management, and DDoS mitigation.

### Observability and product operations

Project dashboards include [runtime logs](/docs/logs), [Observability](/docs/observability), [Web Analytics](/docs/analytics), [Speed Insights](/docs/speed-insights), deployment diagnostics, and usage data. You can forward logs, traces, analytics, and other events to external systems with [Drains](/docs/drains).

## Managing projects

You can view all projects in your team's [Vercel dashboard](/dashboard). Selecting a project opens its project dashboard, where you can inspect deployments and configure its settings. Projects also support avatars, team permissions, project-level roles, and integrations.

For instructions on creating, pausing, resuming, and deleting projects, see [Managing projects](/docs/projects/managing-projects). For the complete list of project settings, see [Project Settings](/docs/project-configuration/project-settings).

## Project limits

To learn more about limits on the number of projects you can have, see [Limits](/docs/limits#general-limits).


---

[View full sitemap](/docs/sitemap)


If you encounter incorrect information, can’t find what you need, need a capability Vercel doesn’t currently offer, or have any other feedback to report, please do it by following the instructions at https://vercel.com/feedback.md.