---
title: list_agent_run_projects
description: Use list_agent_run_projects with Vercel MCP.
url: "https://vercel.com/docs/agent-resources/vercel-mcp/tools/agent-runs/list_agent_run_projects"
last_updated: 2018-10-20
related:
  - /docs/agent-runs
install_vercel_plugin: npx plugins add vercel/vercel-plugin
search_with_vercel_cli: npx vercel@latest docs search "<query>"
search_kb_with_vercel_cli: npx vercel@latest kb search "<query>"
---

# list_agent_run_projects

Use this tool with agents built with [eve](/docs/agent-runs#inspect-runs-with-vercel-mcp).

List projects in a Vercel team that have Agent Runs observability data for eve agents. The response includes run counts and average duration rollups for each project.

| Parameter     | Type   | Required | Default | Description                                                                                                                                                                                                             |
| ------------- | ------ | -------- | ------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| `teamId`      | string | Yes      | -       | The team ID or slug. Use the team that owns the resource.                                                                                                                                                               |
| `environment` | string | No       | -       | Agent run environment, usually "production" or "preview". Defaults to "production".                                                                                                                                     |
| `period`      | string | No       | -       | Preset time range. Ignored when both from and to are provided. Defaults to the dashboard endpoint default. Allowed values: `"5m"`, `"15m"`, `"1h"`, `"6h"`, `"12h"`, `"1d"`, `"3d"`, `"7d"`, `"14d"`, `"30d"`, `"90d"`. |
| `from`        | string | No       | -       | Start time as ISO 8601, Unix seconds, Unix milliseconds, or a relative duration like "12h". Must be used with to.                                                                                                       |
| `to`          | string | No       | -       | End time as ISO 8601, Unix seconds, Unix milliseconds, a relative duration like "1h", or "now". Must be used with from.                                                                                                 |

**Sample prompt:** "Which projects in my team have Agent Runs in the last 24 hours?"

## Search the docs from your terminal

Search the Vercel docs and read pages as Markdown with the Vercel CLI. No login required.

```bash
# Find docs pages by keyword
npx vercel@latest docs search "environment variables"
npx vercel@latest docs search "function timeout"

# Print a docs page as Markdown, by path or URL
npx vercel@latest docs inspect <page>
```

## Search guides from your terminal

Search the Knowledge Base and read guides as Markdown with the Vercel CLI. No login required.

```bash
# Find guides by keyword
npx vercel@latest kb search "rewrites and redirects"
npx vercel@latest kb search "AI SDK streaming"

# Show the latest guides
npx vercel@latest kb

# Print a guide as Markdown, by slug or URL
npx vercel@latest kb inspect <guide>
```

---

[View full sitemap](/docs/sitemap)


If you encounter incorrect information, can’t find what you need, need a capability Vercel doesn’t currently offer, or have any other feedback to report, please do it by following the instructions at https://vercel.com/feedback.md.
